Double Drill Pier System

Home » Portfolio » Double Drill Pier System
Double Drill Pier System 2017-04-10T13:36:17+00:00

Project Description

Double Drill Pier System

 

For two story residential homes or heavier commercial buildings, double drill concrete piers are 8” in diameter formed by drilling two shafts at a predetermined specified angle, this system works well at most areas because the reversed v angle creates maximum upward support.
Pros
1. Can guarantee greater depth than pressed pilings.
2. Less lateral movement
3. Less structural stress
Cons
1. Waiting time of 5-7 days for concrete to cure after pouring.
2. Larger amounts of soil must be removed.
3. For Double Drill concrete piers pricing is higher.

Double Drill Pier System

Leave A Comment

Contact Info

10840 Switzer Ave. Suite #101 Dallas, TX 75238

Phone: 877-554-8284

Web: Foundation and Concrete Services